06-September-2024 Friday
Krasnoyarsk metro. The tunnel boring machine of the first line has been launched. The 30-year-old "long-term construction" has finally started moving
28-April-2024 Sunday
A railway tunnel was opened in Primorye. The second parallel will be broken in the next few days (1450 and 1420 meters). Transsib. Mosmetrostroy
25-February-2024 Sunday
We completed the tunneling for the Krasnaya Railway in the Eastern Sayan Mountains. Making the Southern Passage of the Trans-Siberian Railway double-track