25-January-2021 Monday
Exoskeleton Module PE7 – BACK - BEGINNING
24-January-2021 Sunday
ProEXO exoskeleton testing at the Ministry of Emergency Situations
23-January-2021 Saturday
Yesterday ProEXO tested their samples at the Ministry of Emergency Situations
21-January-2021 Thursday
Who needs it? Exoskeleton for long-term work with and without a load in an incline
09-January-2021 Saturday
Production operation No. 1 Static work while standing with a fixed tilt of the body (from 0 to 90)
09-January-2021 Saturday
Exoskeletons and the ExoFighting project
28-September-2020 Monday
This is what tests of Russian combat exoskeletons look like
v20240901