Sdelanounas ru, Shipbuilding
Page 2

[2] [1]

27-April-2024 Saturday
Three vessels were launched at once: the cruise catamaran “Ekohod-3” for Perm and two passenger river buses

27-April-2024 Saturday
Continuation of the post “The first crab of the CCa5712LS project was launched in Nakhodka. 8 units are being built. The main engines have already been loaded on 6 vessels."

01-March-2024 Friday
The fishing trawler “Captain Martynov” of project ST-192 was commissioned in St. Petersburg. The 5th and 6th continue to build the Admiralty shipyards

[2] [1]

v20221217