Hydroelectric power station, Russia
Page 2

[2] [1]

12-June-2024 Wednesday
A hydroelectric power station was launched in Karelia for 11.8 billion rubles. It took 8 years to build. Power 49.8 MW. The first joint BRICS project in Russia

18-July-2023 Tuesday
In Uglich prevented the preparation of a terrorist attack on the instructions of the special services of Ukraine

08-September-2022 Thursday
The last hydroelectric unit was put into operation at the largest hydroelectric power station in Russia

08-July-2022 Friday
The Ukrainian military launched a missile strike on the hydroelectric power station in Nova Kakhovka

[2] [1]

v20240901